When selecting a medical equipment supplier, the initial purchase price reflects only part of the investment decision. Two suppliers may offer the same type of equipment at similar prices, yet the subsequent operating experience can be very different if one provides complete technical documentation, training, spare parts, and integration support while the other only completes equipment delivery.
For hospitals, the real risks often appear after the contract has been signed:
- The equipment is not compatible with existing infrastructure.
- Required accessories are missing.
- Additional software or connectivity interfaces must be purchased.
- Staff have not received sufficient training.
- Engineer response times are prolonged when equipment fails.
- Spare parts are not readily available.
- Consumables depend entirely on a single source.
- Post-warranty maintenance costs are higher than expected.
- Data are difficult to integrate with HIS, LIS, PACS, or other existing systems.
WHO considers medical equipment management a lifecycle process extending from needs assessment, model and accessory selection, planning for supplies and spare parts, negotiating service and training arrangements, through installation, commissioning, operation, maintenance, and ultimately equipment disposal. This indicates that procurement decisions should not be based only on the equipment price at the time of investment.
Therefore, when evaluating a medical equipment supplier for a hospital, the facility should consider at least eight groups of criteria:
1. Product documentation and information traceability.
2. Technical fit with actual needs.
3. Implementation, installation, and project coordination capability.
4. User training and knowledge transfer.
5. Warranty, SLA, and after-sales support capability.
6. Spare parts, consumables, and long-term maintainability.
7. Data integration, software, and cybersecurity.
8. Total lifecycle cost and the supplier's long-term support capability.
Why Is the Lowest Purchase Price Not Necessarily the Lowest-Cost Option?
Suppose two suppliers quote the same equipment line:
Supplier A
- Lower purchase price.
- Basic warranty.
- LIS interface charged separately.
- No local spare-parts inventory.
- Technical engineers dispatched from another region.
- One-time training at handover.
Supplier B
- Higher purchase price.
- Includes certain required interfaces.
- Has a local technical team.
- Keeps commonly used spare parts in stock.
- Provides a retraining plan.
- Has a clearly defined SLA.
If only the purchase price is compared, Supplier A may appear more competitive.
However, over several years, total cost also depends on:
- Downtime.
- Spare parts.
- Service.
- Software.
- Consumables.
- Training.
- Integration.
- Replacement equipment.
- Costs associated with transferring specimens or delaying services when the equipment is unavailable.
WHO notes that technical specifications developed before procurement help facilities plan more effectively for the implementation, operation, financial resources, infrastructure, and workforce required for equipment.
Therefore, the goal of the selection process should not be:
“Find the supplier selling the equipment at the lowest price.”
Instead, it should be:
“Which supplier is best able to provide and sustain a solution that fits the hospital's needs, resources, and operational lifecycle?”
Before Evaluating Suppliers, the Hospital Needs to Define What It Is Actually Buying

A common mistake is starting with a supplier list before clearly defining the need.
For example, a hospital may state:
“We need an automated clinical chemistry analyzer.”
but has not yet defined:
- Workload.
- Peak-hour volume.
- Test menu.
- Available space.
- Water requirements.
- LIS.
- Backup requirements.
- Reagent model.
- Automation needs.
In that situation, each supplier may propose a completely different configuration.
The comparison can then easily become:
Model A vs. Model B
instead of:
How well do Solutions A and B address the same defined need?
WHO technical specifications are designed specifically to support stakeholders such as biomedical engineers, hospital managers, planners, and procurement officers in tendering, procurement, maintenance planning, and training.
Before inviting suppliers, the facility should standardize at least:
- Intended use.
- Workload.
- Minimum required configuration.
- Accessories.
- Infrastructure conditions.
- Data requirements.
- Service requirements.
- Implementation timeline.
- Long-term operating plan.
Supplier evaluation becomes meaningful only when the requirements are clearly defined.
1. Product Documentation and Information Traceability
The first criterion is not how attractive the brochure looks, but whether the hospital has sufficient information to know exactly what it is purchasing.
The supplier should be able to provide documentation appropriate to the product and transaction scope, such as:
- Equipment name.
- Model.
- Manufacturer.
- Country of manufacture where relevant.
- Configuration.
- Accessories.
- Technical documentation.
- Instructions for use.
- Installation requirements.
- Warranty information.
- Required legal and commercial documentation under applicable regulations.
The hospital should not only ask:
“Are the documents available?”
but also:
“Do the documents correspond to the exact model and configuration being proposed?”
The Model, Options, and Accessories Must Match the Quotation
A manufacturer may offer:
- Multiple models.
- Multiple versions.
- Multiple modules.
- Multiple software options.
- Multiple accessory types.
For example, under the same commercial product name:
- Version A includes Module X.
- Version B does not.
- A particular feature may operate only with an additional license.
- An accessory may be compatible only with a specific configuration.
The quotation should therefore be sufficiently detailed to prevent a situation in which:
A feature appears in the catalogue but is not included in the configuration the hospital is actually purchasing.
The Relationship Between the Supplier and Manufacturer Should Be Clarified
The hospital may ask whether the company is:
- The manufacturer.
- An importer.
- A distributor.
- An authorized dealer.
- An authorized service provider.
- Or only a reseller.
This is particularly important for:
- Warranty.
- Software licenses.
- Spare parts.
- Firmware.
- Remote service.
- Training.
- Technical escalation.
A company may be able to sell the equipment but may not necessarily be authorized to:
- Modify software.
- Activate certain modules.
- Perform warranty service.
- Update firmware.
- Supply genuine spare parts.
The support scope should therefore be confirmed specifically.
2. Technical Fit with the Hospital's Needs
A capable supplier should understand the facility's actual problem, not merely present product features.
For example, when evaluating patient monitors, the hospital should not ask only:
- How many parameters are supported?
- How large is the screen?
It should also consider:
- Which department will use the monitor?
- Is central monitoring required?
- Can modules be shared?
- Will devices move between the ICU and operating room?
- What workflow must the battery support?
- Does the system need to integrate with existing platforms?
For an analyzer:
- How many tests per day?
- Peak volume?
- LIS requirements?
- Reagent model?
- QC requirements?
- Backup?
For PACS:
- Number of modalities?
- Storage capacity?
- Retention period?
- Viewer requirements?
- Integration?
- Disaster recovery?
A supplier that only reads from a catalogue may answer product questions well.
A supplier with implementation capability should also understand:
“Where will the equipment be used, by whom, what will it connect to, and how will it be maintained?”
3. Implementation, Installation, and Project Coordination Capability

A medical equipment supplier does more than deliver boxes.
For many devices, the supplier must be able to coordinate with:
- The user department.
- Biomedical engineering.
- Facility teams.
- MEP.
- IT.
- Radiation safety personnel.
- Contractors.
- The project owner.
WHO emphasizes that the equipment lifecycle includes logistics, incoming inspection, installation, and commissioning.
The hospital should therefore assess:
- Does the supplier have a site survey process?
- Is a site planning guide available?
- Is the site checked before delivery?
- Are interface requirements documented?
- Who is responsible for installation?
- Who performs commissioning?
- Who coordinates with IT?
- Who handles issues when the site does not meet requirements?
4. Training and Knowledge Transfer to Users
Equipment creates value only when users can operate it correctly.
WHO considers user training and training for maintenance personnel important components of the equipment lifecycle.
Training should not be evaluated simply as:
“Does the supplier provide training: Yes/No?”
The hospital should assess what is taught, to whom, for how long, and how competency is evaluated.
5. Warranty, SLA, and After-Sales Support Capability

This is one of the most important criteria when evaluating medical equipment after-sales service.
Two suppliers may both state:
“24-month warranty.”
but the practical value may differ significantly if one supplier:
- Has engineers in the same city.
- Provides a hotline.
- Provides remote support.
- Keeps spare parts in stock.
while the other must wait for engineers to travel from overseas.
WHO technical specification templates also emphasize clarifying warranty start dates, duration, conditions, maintenance support, service-contract type, and maintenance support arrangements.
Warranty Scope Should Be Clearly Defined
The hospital should ask:
- Does the warranty begin at delivery, commissioning, or acceptance?
- Does it include labor?
- Spare parts?
- Travel?
- Preventive maintenance?
- Software?
- Calibration?
- Consumables?
- Batteries?
- Detectors?
- Probes?
- X-ray tubes?
The hospital should not rely only on a line stating:
“Warranty: 2 years.”
The SLA Should Define Timeframes Clearly
An SLA – Service Level Agreement may define:
- Response time.
- Remote-support response time.
- On-site engineer response time.
- Diagnostic time.
- Incident priority levels.
- Escalation procedures.
It is important to distinguish:
Response time
→ how long it takes the supplier to begin responding.
On-site response
→ how long it takes an engineer to arrive.
Repair time
→ how long it takes to restore the equipment.
These are not the same metrics.
For example:
“4-hour SLA”
may only mean that an email is acknowledged within four hours.
The hospital should require a clear definition.
6. Spare Parts, Consumables, and Long-Term Maintainability

Equipment may remain operational for many years, but that does not mean spare parts and supplies will always remain readily available.
The facility should ask:
- Are commonly used spare parts stocked in Vietnam?
- Where is the inventory located?
- What is the lead time?
- Where are major components ordered from?
- Is there an end-of-support policy?
- How long will support continue after the model is discontinued?
WHO also includes post-warranty spare-parts availability among the issues to consider when developing technical specifications.
Consumables May Create Greater Dependency Than the Equipment Itself
Examples include:
- Cartridges.
- Reagents.
- Electrodes.
- Sensors.
- Filters.
- Cuvettes.
- Tips.
- Disposable kits.
- Electrode pads.
- Specialized cables.
The hospital should assess:
- Is there one supplier or multiple sources?
- Are proprietary codes used?
- What is the lead time?
- What is the shelf life?
- Is there a minimum order quantity?
- What are the storage requirements?
- Are alternatives available?
The hospital should avoid purchasing a low-cost device only to discover later that the main consumables are:
- Expensive.
- Difficult to import.
- Subject to large minimum order quantities.
- Prone to expiring before use.
- Available from only one source.
7. Data Integration, Software, and Cybersecurity
Many medical devices today no longer operate as standalone systems.
They may connect with:
- HIS.
- EMR.
- LIS.
- RIS.
- PACS.
- Central monitoring systems.
- CMMS.
- Middleware.
- Cloud services.
- Remote service systems.
The supplier therefore needs the capability to work not only with biomedical teams but also with the hospital's IT and information systems.
“Connectivity Available” Is Not Enough
The hospital should ask:
- Which protocol?
- DICOM?
- HL7?
- API?
- Proprietary interface?
- One-way or bidirectional?
- Is a gateway required?
- Middleware?
- Additional license?
For example:
“LIS connectivity available.”
may in practice mean:
“Connectivity is technically possible, but the hospital must purchase an additional interface license + middleware + mapping services.”
If this is not clarified at the beginning, additional costs may appear after the main contract has already been signed.
Software Has Its Own Lifecycle Costs
The hospital should verify:
- Is the license perpetual or subscription-based?
- Is licensing per device?
- Per user?
- Per module?
- Per year?
- Are upgrade fees charged?
- Are support fees charged?
- Is the number of workstations limited?
It should also clarify:
- If the subscription expires, does the equipment continue operating?
- Which functions become unavailable?
- Can historical data still be accessed?
These issues should be defined contractually rather than relying only on verbal commitments.
8. Total Lifecycle Cost and Long-Term Supplier Capability
This criterion brings all of the previous elements into one overall picture.
Total Cost of Ownership – TCO includes more than the purchase price.
It may include:
- Equipment purchase price.
- Accessories.
- Consumables.
- Reagents.
- Installation.
- Site modifications.
- Training.
- Software.
- Licenses.
- Interfaces.
- Middleware.
- Service contracts.
- Preventive maintenance.
- Spare parts.
- Calibration.
- Electricity.
- Water.
- Cooling.
- Downtime.
WHO emphasizes that equipment selection should be considered together with accessories, consumables, spare parts, and service/training arrangements as part of lifecycle management planning.
How Can TCO Be Compared?
A 5–10 year comparison table may be developed.
| Cost Category | Supplier A | Supplier B | What Should Be Verified? |
|---|---|---|---|
| Initial equipment | Which options are included? | ||
| Installation | Are site modifications required? | ||
| Software/interface | One-time or recurring? | ||
| Consumables/reagents | Expected volume | ||
| Preventive maintenance | How many visits per year? | ||
| Post-warranty service contract | Comprehensive or not? | ||
| Spare parts | Which parts are excluded? | ||
| Additional training | Additional charge? | ||
| Upgrades | Software/hardware | ||
| Downtime contingency | Is loaner/backup equipment available? |
Not every cost needs to be estimated with absolute precision.
The objective is to identify which costs may currently be missing from the comparison.
The Supplier's Financial Capacity and Stability Should Also Be Evaluated

Medical equipment often has a long service life.
The hospital should consider whether the partner is capable of maintaining:
- Its workforce.
- Spare-parts inventory.
- Service system.
- Relationship with the manufacturer.
- Support over many years.
These capabilities should not be inferred solely from:
- Office size.
- Number of sales staff.
- Large exhibition booths.
- Brand recognition.
Appropriate evidence should be reviewed in relation to the scope of the project.
Should Suppliers Be Scored Using a Matrix?
Yes.
A matrix can help reduce decisions based purely on subjective impressions.
For example:
| Criteria Group | Evaluation Area | Illustrative Weight |
|---|---|---|
| Technical fit | Configuration, performance, workflow | 25% |
| Implementation | Site planning, installation, commissioning | 10% |
| Training | User + technical training | 10% |
| After-sales support | Warranty, SLA, service team | 15% |
| Spare parts/consumables | Availability, lead time | 10% |
| IT & integration | Interfaces, software, cybersecurity | 10% |
| TCO | Lifecycle cost | 15% |
| Supplier capability | References, organization, long-term support | 5% |
The weights above are illustrative only.
Hospitals should adjust them according to:
- Equipment type.
- Criticality.
- Budget.
- Operating model.
- Applicable procurement process.
For example:
For PACS, integration may receive a higher weight.
For laboratory analyzers, reagents and TCO may be more important.
For ventilators, service capability and uptime may receive greater priority.
Which Criteria Should Be Pass/Fail?
Not every criterion should be converted into a score.
Certain requirements may be mandatory.
Examples include:
- Failure to meet the minimum configuration.
- Required documentation is unavailable.
- Mandatory infrastructure requirements cannot be met.
- No service approach appropriate to project requirements.
- Mandatory interface requirements are not met.
If a requirement is mandatory, using higher scores in unrelated areas to “compensate” may not be appropriate.
The matrix may therefore have two layers:
Layer 1 – Pass/Fail
→ Is the proposal eligible for further evaluation?
Layer 2 – Scoring
→ Among solutions that meet the mandatory requirements, which option is more suitable?
What Should Suppliers Be Asked to Demonstrate?
A good demonstration should not show only the most attractive product features.
The hospital should prepare a demo script in advance.
It may include:
Normal Workflow
- Start-up.
- Work intake.
- Operation.
- Data export.
- Shutdown/completion.
Exception Workflow
- Network loss.
- Reagent depletion.
- Low battery.
- Alerts.
- Invalid specimen.
- User enters incorrect information.
Maintenance
- Daily maintenance.
- Cleaning.
- Consumable replacement.
- Access-panel opening.
IT
- Worklist.
- Data export.
- User management.
- Audit log.
- Interface.
Service
- Remote diagnostics.
- Log collection.
- Error reporting.
A supplier willing to demonstrate exception workflows often provides the hospital with more useful information than a demonstration performed only under ideal conditions.
12 Questions to Send Suppliers Before Shortlisting
1. Exactly which modules, options, and accessories are included in the quoted configuration?
2. Which additional items are required for the equipment to operate within the hospital's intended workflow?
3. What are the site requirements for the specific model?
4. Which team performs installation and commissioning?
5. Which user groups are included in the training program?
6. When does the warranty begin, and what does it include?
7. How is the SLA specifically defined?
8. Where are commonly used spare parts stored, and what are the lead times?
9. Are alternative sources available for consumables or reagents?
10. Which licenses or middleware are required for HIS/LIS/PACS connectivity?
11. What are the expected post-warranty service, software, and consumable costs?
12. Is there a reference site using the same model under a similar workload?
These questions will not cover every project, but they can help hospitals quickly identify unclear areas within a supplier proposal.
Six-Step Medical Equipment Supplier Evaluation Process

Step 1: Standardize Requirements
Define:
- Use case.
- Workload.
- Configuration.
- Infrastructure.
- Data.
- Service.
Step 2: Screen Documentation
Review:
- Product.
- Manufacturer.
- Configuration.
- Required documentation.
- Support scope.
Step 3: Conduct Technical Evaluation
Perform:
- Specification review.
- Demonstration.
- Site review.
- Workflow assessment.
- IT assessment.
Step 4: Evaluate Service Capability
Review:
- Warranty.
- SLA.
- Service team.
- Spare parts.
- Training.
Step 5: Calculate TCO
Estimate:
- CapEx.
- Consumables.
- Service.
- Software.
- Integration.
- Infrastructure.
Step 6: Review References and Negotiate the Contract
Confirm:
- Reference sites.
- Scope.
- Timeline.
- Responsibility matrix.
- SLA.
- Deliverables.
The specific steps will also depend on each facility's procurement process and applicable legal requirements.
Medical Equipment Supplier Selection Checklist
Product
- Clear model identification.
- Clear configuration.
- Accessories listed.
- Appropriate technical documentation.
- Product documentation is traceable.
Technical
- Meets the intended use case.
- Appropriate capacity.
- Compatible with infrastructure.
- Demonstration available.
- Scalable where required.
Implementation
- Site survey.
- Installation plan.
- Project manager.
- Commissioning plan.
- Responsibility matrix.
Training
- User training.
- Technical training where appropriate.
- Documentation.
- Training for new staff.
- Training after upgrades.
After-Sales Support
- Clear warranty terms.
- Clear SLA.
- Hotline.
- Remote support.
- Local engineers or clearly defined service coverage.
Spare Parts and Consumables
- Lead times.
- Safety stock.
- Critical spares.
- Supply sources.
- End-of-support policy.
IT
- LIS/PACS/HIS.
- API/interface.
- Middleware.
- Licenses.
- Data export.
- Remote access.
- Cybersecurity.
Cost
- Purchase price.
- Site work.
- Consumables.
- Service.
- Software.
- Integration.
- Upgrades.
- TCO.
Supplier
- Clear relationship with the manufacturer.
- Appropriate technical team.
- Reference sites.
- Implementation capability.
- Long-term support capability.
Frequently Asked Questions About Selecting a Medical Equipment Supplier

Should a Hospital Select a Medical Equipment Supplier Based on the Lowest Price?
No. The decision should not be based only on purchase price. The hospital should also assess technical fit, implementation, training, warranty, service, spare parts, integration, and total lifecycle cost.
Is a Large Distributor Always Better Than a Smaller Supplier?
Not necessarily. Company size is only one factor. More important is capability relating to the specific equipment line, geographic area, and service scope the hospital requires.
What Should a Supplier SLA Include?
At minimum, it should clarify response times, support methods, on-site response where required, escalation, and procedures when an incident cannot be resolved immediately. Specific requirements depend on the criticality of the equipment.
Does the Supplier Need to Have Engineers in the Same Local Area?
Not in every case. However, distance from the service team may affect support time and should therefore be considered when evaluating SLA performance and potential downtime.
Should the Supplier Keep Spare Parts at the Hospital?
It depends on equipment criticality, lead time, cost, and contingency arrangements. Not every device requires an onsite spare-parts inventory.
Are Reference Sites Important?
Yes, particularly for large equipment or technologies that are new to the facility. However, references provide supplementary real-world evidence and do not replace the hospital's own technical and workflow assessment.
How Should Two Suppliers with Very Different Prices Be Compared?
The configurations should first be standardized, then the hospital should compare the full scope, accessories, software, interfaces, training, warranty, service, consumables, and TCO. Two quotations with different prices may not actually represent the same solution.
Should the Supplier Be Responsible for LIS/PACS Integration?
This should be defined in the contract. Many projects require coordination among the equipment supplier, hospital, LIS/PACS vendor, and IT team. It should not be assumed that one party will automatically take full responsibility for integration.
Is One Training Session at Handover Enough?
It may be sufficient for certain simple devices and stable teams, but complex equipment may require additional training, training for new staff, software-update training, and competency assessment.
When Should a Supplier Be Removed from the Shortlist?
When the supplier does not meet mandatory project requirements such as the technical configuration, required documentation, implementation capability, support level, or other conditions defined as pass/fail.
This article is provided for informational purposes regarding the evaluation of medical equipment suppliers. Criteria, weights, documentation requirements, and selection processes should be adjusted according to the equipment type, hospital model, procurement process, contract, and applicable regulations.
Connect with Suppliers Based on Actual Investment Needs at PHARMEDI & HEALTHCARE VIETNAM 2026
Selecting a medical equipment supplier usually requires more than viewing a product once or receiving a quotation. Hospitals also need to assess implementation capability, training, integration, after-sales service, spare parts, and the supplier's ability to support the equipment throughout its lifecycle. An exhibition environment can therefore be more useful when visitors define their needs in advance and prioritize discussions that match their investment plans.
At PHARMEDI & HEALTHCARE VIETNAM 2026, alongside the Product Showcase Area, the Organizing Committee continues to provide the Hosted Buyer Program. According to official information, the program is designed for potential buyers, senior leaders, and senior professionals, with the aim of increasing opportunities for cooperation during the exhibition. PHARMEDI VIETNAM 2026 also brings together an ecosystem spanning medical devices, diagnostics, laboratory technologies, digital health, and smart healthcare technologies.
For hospitals or healthcare facilities with investment plans that fit the program, preparing a supplier evaluation checklist in advance can help discussions at PHARMEDI VIETNAM 2026 focus on the factors that genuinely influence supplier selection:
- Which products and configurations actually match the facility's needs?
- What technical team and support coverage does the supplier have in Vietnam?
- How far do installation, commissioning, and training extend within the supply scope?
- How are warranty and SLA terms specifically defined?
- Where are critical spare parts and consumables supplied from, and what are the lead times?
- What post-warranty service-contract models and expected costs apply?
- How does the equipment connect with HIS, LIS, RIS, or PACS?
- Are middleware, gateways, or licenses required beyond the equipment quotation?
- Can data be exported and transferred to another system when required?
- Does the supplier have a reference site using the same model or a similar operating model?
Consider Supplier Selection Across the Entire Investment Lifecycle
Alongside networking and product exploration, the International Conference Series on Investment and Innovation in Healthcare, taking place on September 22–23, 2026, broadens the perspective from selecting an individual supplier to how hospitals make and sustain investment decisions.
During Day 1 – September 22, the program includes the session “Hospital Supply Procurement & Investment Decisions: How Are Hospitals in Vietnam Approaching Them?”. This topic is particularly relevant to supplier shortlisting because procurement decisions should consider configuration, contract scope, lifecycle cost, implementation capability, and after-sales service together rather than simply placing quotations side by side.
On Day 2 – September 23, the focus shifts to Hospital Management & Operations. This perspective continues the key question after procurement: can the selected partner adequately support the equipment so that it can remain operational, integrate into hospital systems, respond to incidents, and adapt to long-term development needs?
The supplier evaluation process can therefore be viewed as a more complete sequence:
Actual need → solution shortlist → supplier evaluation → investment decision → implementation → long-term operation and support.
After Shortlisting, Explore the Remaining Questions in Greater Depth
B2B Matchmaking at PHARMEDI adds a one-to-one connection format between professional visitors and companies based on needs and potential fit. For hospitals that already have a shortlist or evaluation criteria, this provides an opportunity to focus on questions that are difficult to resolve through catalogues or quotations alone.
Instead of repeating basic product specifications, facilities can explore actual SLA arrangements, technical-team capability, spare-parts lead times, warranty scope, post-warranty costs, interfaces and licenses, contingency options when equipment is unavailable, data export rights, or support plans as the model approaches end of life.
Alongside the Hosted Buyer Program and B2B Matchmaking, the Product Showcase Area also allows professional visitors to explore solutions, compare technologies, and identify partners that may require further evaluation after the exhibition.
By preparing evaluation criteria before meeting suppliers, hospitals can use their time at PHARMEDI & HEALTHCARE VIETNAM 2026 to narrow the list of potential partners, identify missing information, and create a foundation for the next stage of technical and commercial evaluation. This also places purchase price in the appropriate context: an important criterion, but not one that should be separated from implementation capability, service quality, and long-term operating costs.
Dates: September 22–24, 2026
Venue: Saigon Exhibition and Convention Center (SECC), Ho Chi Minh City
Exhibitor Registration:https://pharmed.vn/exhibitor/application-form
Visitor Registration:https://ers-vn.informa-info.com/pha2026?cid=FB
Contact
Booth Booking: [email protected] (Thanh Thuý)
Media Support: [email protected] (Anita Pham)
Visitor Support: [email protected] (Ciel Le)